[   ]06 30 17 Regs and Legs release 05 dw jtm ke.docx.pdf2018-10-25 13:11 95K 
[   ]09 12 16 Keeping Clean Reliable Electricity Affordable and Lowering People's Bills BG 02.docx_1.pdf2018-10-25 13:11 121K 
[   ]09 12 16 Keeping Clean Reliable Electricity Affordable and Lowering People's Bills BG 07-FORMATTED.docx_9.pdf2018-10-25 13:11 109K 
[   ]09 12 16 SFT NR 07-FORMATTED.docx_4.pdf2018-10-25 13:11 107K 
[   ]09 12 16 SFT NR sh 03 clean - Paris edit and KB edit.docx.pdf2018-10-25 13:11 114K 
[   ]09 16 16 Premier's Note - Energy Avail in Ottawa.docx.pdf2018-10-25 13:11 166K 
[   ]09 16 16 Premier's Note - Energy Avail in Ottawa.docx_1.pdf2018-10-25 13:11 71K 
[   ]2. 20171023 - MMMP (Storyboard and Signature Initiatives) v5_1.pdf2018-10-25 13:11 562K 
[   ]2. 20171023 - MMMP (Storyboard and Signature Initiatives) v5_2.pdf2018-10-25 13:11 494K 
[   ]2. 20171023 - MMMP (Storyboard and Signature Initiatives) v5_3.pdf2018-10-25 13:11 494K 
[   ]2. 20171023 - MMMP (Storyboard and Signature Initiatives) v5_4.pdf2018-10-25 13:11 494K 
[   ]2. Electricity System Planning Decisions v4 (Feb 9).docx.pdf2018-10-25 13:11 153K 
[   ]4 P&B Key measures.pdf2018-10-25 13:11 235K 
[   ]8. What do Ontarians pay for electricity v4 (Feb 7).docx.pdf2018-10-25 13:11 373K 
[   ]12 14 17 End of Sitting release 02 jtm eg.docx.pdf2018-10-25 13:11 137K 
[   ]13. What the LTEP Says v4 (Feb 5).docx.pdf2018-10-25 13:11 253K 
[   ]2016-10-17- JEP deck for Caucus v5.pptx_2.pdf2018-10-25 13:11 1.8M 
[   ]2016-12-09 rate mitigation - distributed.pptx.pdf2018-10-25 13:11 375K 
[   ]2017-06-16- PO LTEP Deck - Innovation and Customer Choice v5.pptx_1.pdf2018-10-25 13:11 599K 
[   ]2017-06-20 Critical Path Update for OESP v8.pptx_1.pdf2018-10-25 13:11 187K 
[   ]2017-07-24- CBN- LTEP- v13- FINAL.docx.pdf2018-10-25 13:11 432K 
[   ]2017-08-30- CBN- LTEP2- v20 FINAL- CAB binders- no pw.docx_1.pdf2018-10-25 13:11 449K 
[   ]2017DocStoryboardV18.pdf2018-10-25 13:11 404K 
[   ]2017 LTEP Outlooks_Briefing_Aug1_Clean.pptx_4.pdf2018-10-25 13:11 1.3M 
[   ]2017 LTEP Outlooks_Briefing_Aug1_Clean.pptx_5.pdf2018-10-25 13:11 1.3M 
[   ]20160909 Key Facts - 3 Things You Need To Know - 5 pm CLEAN_sy bb.doc_2.pdf2018-10-25 13:11 93K 
[   ]20170227 O Reg 53-05 Amendment_LRC_MinistryApprovalForm.doc.pdf2018-10-25 13:11 147K 
[   ]20171219 Template (Summary - Document Initiative)-FNDC Draft IEP_v6_clea....docx_1.pdf2018-10-25 13:11 102K 
[   ]Accepted_ LTEP _ OFHP Model Assumptions.pdf2018-10-25 13:11 11K 
[   ]Accepted_ LTEP_ Ontario Fair Hydro Plan Reconciliation.pdf2018-10-25 13:11 14K 
[   ]Accepted_ OFHP Legislative Update.pdf2018-10-25 13:11 11K 
[   ]Affordability Initiatives that will be profiled in Document.docx.pdf2018-10-25 13:11 35K 
[   ]Affordability Initiatives that will be profiled in Document.pdf2018-10-25 13:11 15K 
[   ]BG July 1 2017 regs and fees_v2 (3) bb.docx.pdf2018-10-25 13:11 148K 
[   ]BG July 1 2017 regs and fees_v2 (3) bb.docx_1.pdf2018-10-25 13:11 148K 
[   ]Backgrounder - Energy Sector Efficiencies - March 2 2017_5.pdf2018-10-25 13:11 96K 
[   ]Backgrounder - Enhancing Electricity Support and Conservation Programs -..._4.pdf2018-10-25 13:11 183K 
[   ]Backgrounder - Previous Actions to Reduce Energy Costs - March 2 2017_5.pdf2018-10-25 13:11 99K 
[   ]Backgrounder - Refinancing the Global Adjustment - March 2 2017_5.pdf2018-10-25 13:11 88K 
[   ]Bad idea alert_ The Clean Energy Adjustment.pdf2018-10-25 13:11 78K 
[   ]Budget Planning Doc -Premiers note- january 10.docx.pdf2018-10-25 13:11 51K 
[   ]CBN - Electricity Price Mitigation DRAFT v4.docx_8.pdf2018-10-25 13:11 538K 
[   ]CBN - Electricity Price Mitigation DRAFT v4.docx_9.pdf2018-10-25 13:11 538K 
[   ]CBN - Electricity Price Mitigation DRAFT v4 clean.docx_4.pdf2018-10-25 13:11 402K 
[   ]CBN - Electricity Price Mitigation DRAFT v4 clean.docx_5.pdf2018-10-25 13:11 402K 
[   ]CBN - Electricity Price Mitigation DRAFT v6 clean.docx_4.pdf2018-10-25 13:11 375K 
[   ]CBN - Electricity Price Mitigation DRAFT v6 clean.docx_5.pdf2018-10-25 13:11 375K 
[   ]CLB Opinion on proposed Fair Hyro Plan invoicing regulations - 8 Dec 201....docx_3.pdf2018-10-25 13:11 101K 
[   ]Cabinet Note - LTEP Part 2.docx_1.pdf2018-10-25 13:11 157K 
[   ]Cabinet Submission - Electricity Price Mitigation FINAL.PDF_4.pdf2018-10-25 13:11 1.2M 
[   ]Cabinet Submission - Electricity Price Mitigation_Feb15 FINAL.PDF_1.pdf2018-10-25 13:11 1.8M 
[   ]Cabinet Submission - Electricity Price Mitigation_Feb15 FINAL.PPTX_2.pdf2018-10-25 13:11 2.3M 
[   ]Cabinet Submission - Electricity Price Mitigation_Feb 22_600_clean.pptx_6.pdf2018-10-25 13:11 3.7M 
[   ]Cap and Trade Proceeds to Electricity - Interministerial briefing on Nov 7.pdf2018-10-25 13:11 1.1M 
[   ]Cap and Trade Proceeds to Electricity - Interministerial briefing on Nov 7_1.pdf2018-10-25 13:11 1.1M 
[   ]Change Chart -for 17-06-12 - AR.docx_1.pdf2018-10-25 13:11 78K 
[   ]Class B Price Mitigation Options v7_Mar1-18.pptx_6.pdf2018-10-25 13:11 397K 
[   ]Class B Price Mitigation Options v7_Mar1-18.pptx_7.pdf2018-10-25 13:11 397K 
[   ]Comms Snapshot- Electricity Price Mitigation V4_noon 20160910.doc_3.pdf2018-10-25 13:11 182K 
[   ]Comparison of Electricity Price Forecasts w OFHP.PPTX_3.pdf2018-10-25 13:11 123K 
[   ]Comparison of Electricity Price Forecasts w OFHP.PPTX_4.pdf2018-10-25 13:11 123K 
[   ]Conservation Costs (Feb 13 2017) (4).doc.pdf2018-10-25 13:11 88K 
[   ]Cost Shifting v2.pptx.pdf2018-10-25 13:11 155K 
[   ]Declined_ MEETING - OFHP Legislation Meeting - with Andrew, Andrew, Blane, Bill, Bryan, Rebecca, and Gillian.pdf2018-10-25 13:11 12K 
[   ]Declined_ Rate Mitigation Implementation Update.pdf2018-10-25 13:11 13K 
[   ]Delivery charge one pager.docx_2.pdf2018-10-25 13:11 59K 
[   ]Delivery charge one pager.docx_3.pdf2018-10-25 13:11 59K 
[   ]Delivery charge one pager.docx_4.pdf2018-10-25 13:11 59K 
[   ]Designing a multi-service procurement -- Note to Minister's Office, March 6, 2017.pdf2018-10-25 13:11 101K 
[   ]Draft Legal Opinion regarding OPTrust Select Governance Issue - February....docx.pdf2018-10-25 13:11 416K 
[   ]EN - FHP Legislation Presser - DRAFT - May 5.docx.pdf2018-10-25 13:11 55K 
[   ]ENERGY, MOECC, MEDG, MNDM, MNRF, MOF, CO, PO Meeting _ GGRA Proceeds for Electricity Consumers.pdf2018-10-25 13:11 36K 
[   ]ENERGY Mandate Letter.docx.pdf2018-10-25 13:11 98K 
[   ]ENERGY signing EN-tracked.docx.pdf2018-10-25 13:11 178K 
[   ]Electricity 5-Autos May 31 2017 final_1.pdf2018-10-25 13:11 423K 
[   ]Electricity Briefing for Minister Matthews.pdf2018-10-25 13:11 17K 
[   ]Emily.pdf2018-10-25 13:11 67K 
[   ]FW_ Affordability metrics.pdf2018-10-25 13:11 56K 
[   ]FW_ Agenda_ Fiscal Prep Committee, September 21 (10_00 a.m to 11_30 a.m).pdf2018-10-25 13:11 34K 
[   ]FW_ CBN + materials_2.pdf2018-10-25 13:11 33K 
[   ]FW_ CFIG -Gary Sands and The OEB RPP Pilots.pdf2018-10-25 13:11 52K 
[   ]FW_ Class B_1.pdf2018-10-25 13:11 24K 
[   ]FW_ Confidential _ Price Comparison Forecasts_1.pdf2018-10-25 13:11 45K 
[   ]FW_ Confidential _ Price Comparison Forecasts_2.pdf2018-10-25 13:11 49K 
[   ]FW_ DRAFT Communications Products _ Fair Hydro Plan Act.pdf2018-10-25 13:11 32K 
[   ]FW_ DRAFT PD&G Deck_1.pdf2018-10-25 13:11 28K 
[   ]FW_ Deck for LTEP _ OFHP Meeting.pdf2018-10-25 13:11 30K 
[   ]FW_ Delivery charges question.pdf2018-10-25 13:11 55K 
[   ]FW_ Delivery charges question_1.pdf2018-10-25 13:11 49K 
[   ]FW_ Direct to Cabinet for Wednesday _ Ontario Fair Hydro Plan Regs_2.pdf2018-10-25 13:11 19K 
[   ]FW_ ENE options.pdf2018-10-25 13:11 56K 
[   ]FW_ Electricity cost chart_.pdf2018-10-25 13:11 47K 
[   ]FW_ Energy reg - Reg2017.0643 - Amending O. Reg. 196_17 (Invoicing Requirements) - Sealing issue.pdf2018-10-25 13:11 78K 
[   ]FW_ FNDC Band-owned Building Expansion - MOF Request.pdf2018-10-25 13:11 50K 
[   ]FW_ FOR REVIEW_ Electricity BG.pdf2018-10-25 13:11 32K 
[   ]FW_ FOR REVIEW_ SFT NR.pdf2018-10-25 13:11 32K 
[   ]FW_ Fair Hydro - Cabinet Tracking_1.pdf2018-10-25 13:11 57K 
[   ]FW_ Final CBN_3.pdf2018-10-25 13:11 29K 
[   ]FW_ Fiscal Prep Materials _ February 6 2017.pdf2018-10-25 13:11 30K 
[   ]FW_ For Review_ Draft ECO Report QA.pdf2018-10-25 13:11 53K 
[   ]FW_ For review_ Year-end wrap and legislative hightlights from the Fall sitting.pdf2018-10-25 13:11 53K 
[   ]FW_ Hybrid Option _ Developing.pdf2018-10-25 13:11 38K 
[   ]FW_ Latest Hydro Bill_2.pdf2018-10-25 13:11 38K 
[   ]FW_ Legal Opinion (Internal) on OPTrust.pdf2018-10-25 13:11 30K 
[   ]FW_ Mandate Letters.pdf2018-10-25 13:11 34K 
[   ]FW_ Media Request.pdf2018-10-25 13:11 102K 
[   ]FW_ OESP - Help__1.pdf2018-10-25 13:11 39K 
[   ]FW_ OPO line.pdf2018-10-25 13:11 55K 
[   ]FW_ On the next episode...RE_ Meeting _ OFHP Implementation Update.pdf2018-10-25 13:11 45K 
[   ]FW_ Polling.pdf2018-10-25 13:11 20K 
[   ]FW_ Products for Wednesday Morning Meeting.pdf2018-10-25 13:11 38K 
[   ]FW_ Rate Mitigation - CLB Opinion re GA Financing.pdf2018-10-25 13:11 36K 
[   ]FW_ Rate Mitigation - CLOC Opinion re Conservation Costs.pdf2018-10-25 13:11 33K 
[   ]FW_ Rate Mitigation Plan Options_Feb 9 version _2000_Clean.pptx.pdf2018-10-25 13:11 16K 
[   ]FW_ Rate Mitigation Plan Options_Feb 9 version _2000_Clean.pptx_1.pdf2018-10-25 13:11 20K 
[   ]FW_ Rate Mitigation Plan Options_Feb 9 version _2000_Clean.pptx_2.pdf2018-10-25 13:11 16K 
[   ]FW_ TB note.pdf2018-10-25 13:11 19K 
[   ]FW_ Update & Critical Questions on Fall Items _ RE_ Legislative Planning.pdf2018-10-25 13:11 67K 
[   ]FW_ new minute_4.pdf2018-10-25 13:11 41K 
[   ]FW_ prep materials.pdf2018-10-25 13:11 53K 
[   ]Fair Adjustment excerpt.docx_3.pdf2018-10-25 13:11 91K 
[   ]For Review_ July 1 Regs_Fees BG.pdf2018-10-25 13:11 29K 
[   ]Frank.pdf2018-10-25 13:11 45K 
[   ]Fri - Hydro Calls.docx.pdf2018-10-25 13:11 507K 
[   ]Fw_ Briefings - heads up.pdf2018-10-25 13:11 56K 
[   ]Fw_ CBN + materials_1.pdf2018-10-25 13:11 24K 
[   ]Fw_ CVMA CEO meeting with Premier Wynee_1.pdf2018-10-25 13:11 28K 
[   ]Fw_ Class B.pdf2018-10-25 13:11 23K 
[   ]Fw_ Confidential Advice _ Renewable Procurements.pdf2018-10-25 13:11 63K 
[   ]Fw_ Cost Shifts (v1).pdf2018-10-25 13:11 20K 
[   ]Fw_ Deck for _Price Curve_ discussion.pdf2018-10-25 13:11 15K 
[   ]Fw_ Energy _ AG bill presentment issue.pdf2018-10-25 13:11 48K 
[   ]Fw_ FHP products.pdf2018-10-25 13:11 54K 
[   ]Fw_ Fair Hydro Plan.pdf2018-10-25 13:11 35K 
[   ]Fw_ Final CBN_2.pdf2018-10-25 13:11 20K 
[   ]Fw_ Final Rate Mitigation Media Products_3.pdf2018-10-25 13:11 50K 
[   ]Fw_ For Review_ July 1 Regs_Fees BG.pdf2018-10-25 13:11 33K 
[   ]Fw_ HQEM _ LTEP = 2pm Product_1.pdf2018-10-25 13:11 36K 
[   ]Fw_ HQEM _ LTEP = 2pm Product_2.pdf2018-10-25 13:11 34K 
[   ]Fw_ ICI expansion - greenhouses.pdf2018-10-25 13:11 42K 
[   ]Fw_ LTEP Cabinet Note.pdf2018-10-25 13:11 22K 
[   ]Fw_ MMMP e-Binder.pdf2018-10-25 13:11 21K 
[   ]Fw_ Mandate Letters - Second Batch.pdf2018-10-25 13:11 36K 
[   ]Fw_ NR + BGs for signoff_2.pdf2018-10-25 13:11 36K 
[   ]Fw_ National Steel Car Limited vs IESO and Minister of Energy_1.pdf2018-10-25 13:11 63K 
[   ]Fw_ National Steel Car Limited vs IESO and Minister of Energy_2.pdf2018-10-25 13:11 36K 
[   ]Fw_ OESP - Help_.pdf2018-10-25 13:11 17K 
[   ]Fw_ PO Briefing LTEP _ OFHP Modelling_1.pdf2018-10-25 13:11 22K 
[   ]Fw_ Rate Mitigation -OEB + IESO.pdf2018-10-25 13:11 22K 
[   ]Fw_ Stakeholders _ Ontario's Fair Hydro Plan.pdf2018-10-25 13:11 34K 
[   ]Fw__7.pdf2018-10-25 13:11 25K 
[   ]Fw_ leg planning_1.pdf2018-10-25 13:11 53K 
[   ]Fw_ materials.pdf2018-10-25 13:11 28K 
[   ]Fwd_ Confidential Advice to Govt - OEB 5 Point Plan_2.pdf2018-10-25 13:11 23K 
[   ]Fwd_ Electricity Companies Gaming the Electricity System_1.pdf2018-10-25 13:11 50K 
[   ]Fwd_ Fair Adjustment Excerpt_1.pdf2018-10-25 13:11 19K 
[   ]Fwd_ Fair Hydro Plan.pdf2018-10-25 13:11 31K 
[   ]Fwd_ Latest Energy Relief Deck.pdf2018-10-25 13:11 14K 
[   ]Fwd_ MMMP e-Binder.pdf2018-10-25 13:11 15K 
[   ]Fwd_ MMMP e-Binder_1.pdf2018-10-25 13:11 15K 
[   ]Fwd_ OEB 5 Point Plan revision.pdf2018-10-25 13:11 30K 
[   ]Fwd_ optrust.pdf2018-10-25 13:11 68K 
[   ]GA Financing Opinion - Feb 10.docx_2.pdf2018-10-25 13:11 313K 
[   ]GASmoothingFiscalSlide.pptx_1.pdf2018-10-25 13:11 58K 
[   ]HBN - FHP - MO - May 5.docx.pdf2018-10-25 13:11 226K 
[   ]LTEP Implementation Directives.pdf2018-10-25 13:11 16K 
[   ]LTEP_OFHP.pdf2018-10-25 13:11 23K 
[   ]Leg Planning Calendar (Dec 1 2016)_2.pdf2018-10-25 13:11 752K 
[   ]Leg Planning Calendar (Feb 8 2016)_2.pdf2018-10-25 13:11 841K 
[   ]Leg Planning Calendar (Feb 17 2017)_2.pdf2018-10-25 13:11 822K 
[   ]Leg Planning Calendar (Nov 9 2016)_2.pdf2018-10-25 13:11 907K 
[   ]Leg Planning Calendar (Oct 7 2016)_2.pdf2018-10-25 13:11 701K 
[   ]Leg Planning Calendar (Oct 13 2016)_ed_2.pdf2018-10-25 13:11 730K 
[   ]Leg Planning Calendar (Oct 19 2016)_2.pdf2018-10-25 13:11 756K 
[   ]Leg Planning Calendar (Oct 27 2016)_1.pdf2018-10-25 13:11 768K 
[   ]Leg Planning Calendar (Sep 23 2016)_2.pdf2018-10-25 13:11 719K 
[   ]Leg Planning Calendar (Sep 29 2016)_2.pdf2018-10-25 13:11 719K 
[   ]Leg Planning Tracker (Apr 11 2017)_2.pdf2018-10-25 13:11 1.0M 
[   ]Leg Planning Tracker (Apr 20 2017)_2.pdf2018-10-25 13:11 1.0M 
[   ]Leg Planning Tracker (Apr 27 2017)_2.pdf2018-10-25 13:11 1.0M 
[   ]Leg Planning Tracker (Mar 30 2017)_2.pdf2018-10-25 13:11 962K 
[   ]Leg Planning Tracker (May 4 2017).pdf2018-10-25 13:11 1.0M 
[   ]Leg Planning Tracker (May 11 2017)_2.pdf2018-10-25 13:11 1.0M 
[   ]Leg Planning Tracker (May 26 2017)_2.pdf2018-10-25 13:11 918K 
[   ]Legislative Planning_7.pdf2018-10-25 13:11 17K 
[   ]Legislative Planning_8.pdf2018-10-25 13:11 27K 
[   ]Long Term Report and Q3 Update.pdf2018-10-25 13:11 23K 
[   ]MMMP Prep Materials.pdf2018-10-25 13:11 20K 
[   ]Media QA - FHP - MO.docx.pdf2018-10-25 13:11 287K 
[   ]Memo re_ the Clean Energy Adjustment_1.pdf2018-10-25 13:11 26K 
[   ]Memo re the Clean Energy Adjustment_1.pdf2018-10-25 13:11 318K 
[   ]Memo re the Clean Energy Adjustment_2.pdf2018-10-25 13:11 318K 
[   ]Microsoft_Excel_Worksheet12.xlsx_30.pdf2018-10-25 13:11 13K 
[   ]Microsoft_Excel_Worksheet12_30.xlsx2018-10-25 11:07 9.7K 
[   ]Minister Thibeault - Presser Remarks - Draft - FHP - May 5.docx.pdf2018-10-25 13:11 109K 
[   ]NR - FHP - DRAFT - May 5.doc.pdf2018-10-25 13:11 130K 
[   ]NR - LRP II Decision - 20160920 - to DMO (clean).docx.pdf2018-10-25 13:11 106K 
[   ]National Steel Car Ltd v IESO and ON - N of App Aug 1 2017.pdf2018-10-25 13:11 332K 
[   ]News Release - Fair Hydro Plan - March 2 2017_5.pdf2018-10-25 13:11 190K 
[   ]Note for review_ Energy Avail in Ottawa.pdf2018-10-25 13:11 31K 
[   ]November 2 - Cap and Trade Proceeds to Electricity Option 4 -ESPD ADM Ap....pptx_1.pdf2018-10-25 13:11 166K 
[   ]OEB 5 Point Plan.pptx_2.pdf2018-10-25 13:11 519K 
[   ]OESP.pdf2018-10-25 13:11 14K 
[   ]ONT-QC Energy Backgrounder FINAL.docx_1.pdf2018-10-25 13:11 97K 
[   ]ONT-QC Energy Backgrounder FINAL.docx_2.pdf2018-10-25 13:11 97K 
[   ]OPTrust Select Briefing Deck - March 16 120pm.pptx.pdf2018-10-25 13:11 341K 
[   ]Ontario Finance Focus Group Research Detailed Findings March 17 2017 TC.doc_6.pdf2018-10-25 13:11 104K 
[   ]PD&G Appendices (2017-06-12)_1.pdf2018-10-25 13:11 642K 
[   ]PD&G Deck.pdf2018-10-25 13:11 17K 
[   ]PD&G Deck and Appendices (2014-6-14) 1015AM.PDF.pdf2018-10-25 13:11 1.7M 
[   ]PD+G Deck (2017-06-12) 540PM.pptx_1.pdf2018-10-25 13:11 297K 
[   ]Parliament 41 - Summary of Government Bills.pdf2018-10-25 13:11 149K 
[   ]Pilot Calendar 2017.pdf2018-10-25 13:11 429K 
[   ]Planning Calendar 16-06-09_1.pdf2018-10-25 13:11 144K 
[   ]Premier's note - Q3 16.17 update - jacob mksyartinian.docx.pdf2018-10-25 13:11 99K 
[   ]Price Mitigation Proposals_Dec5-16_v11.pptx_4.pdf2018-10-25 13:11 637K 
[   ]Price Mitigation Proposals_Dec5-16_v11.pptx_5.pdf2018-10-25 13:11 637K 
[   ]Proceeds Recycling - Analysis of SME impact.pdf2018-10-25 13:11 32K 
[   ]Proceeds Recycling - Class B study 20161201 v4.pptx_4.pdf2018-10-25 13:11 237K 
[   ]Proposed Initiatives to Transform Ontarios Electricity Sector 20170113.pptx.pdf2018-10-25 13:11 1.3M 
[   ]Q3 update_FiscalStrategyPlacemat 020217.pptx.pdf2018-10-25 13:11 136K 
[   ]RAN Electricity Price Mitigation v9 2016 09 09.doc_5.pdf2018-10-25 13:11 1.6M 
[   ]RAN Electricity Price Mitigation v9 2016 09 09.doc_6.pdf2018-10-25 13:11 1.6M 
[   ]RAN Electricity Price Mitigation v13 2016 09 11.doc_4.pdf2018-10-25 13:11 823K 
[   ]RE_ Affordability metrics.pdf2018-10-25 13:11 53K 
[   ]RE_ Affordability metrics_1.pdf2018-10-25 13:11 36K 
[   ]RE_ Bill estimates TIME SENSITiVE.pdf2018-10-25 13:11 65K 
[   ]RE_ Bill estimates TIME SENSITiVE_1.pdf2018-10-25 13:11 61K 
[   ]RE_ Bill estimates TIME SENSITiVE_2.pdf2018-10-25 13:11 55K 
[   ]RE_ CRA Wet Signature.pdf2018-10-25 13:11 50K 
[   ]RE_ Communications Products _ Fair Hydro Act intro May 10_2.pdf2018-10-25 13:11 60K 
[   ]RE_ Electricity cost chart_.pdf2018-10-25 13:11 42K 
[   ]RE_ Energy Backgrounders for Review_1.pdf2018-10-25 13:11 49K 
[   ]RE_ FOR REVIEW FW_ please review_ child care + electricity web pages.pdf2018-10-25 13:11 50K 
[   ]RE_ FPC this am - Jeff Lyash.pdf2018-10-25 13:11 44K 
[   ]RE_ Fiscal Prep Materials _ February 6 2017.pdf2018-10-25 13:11 44K 
[   ]RE_ For Review_ Energy Products_2.pdf2018-10-25 13:11 29K 
[   ]RE_ For Review_ July 1 Regs_Fees BG.pdf2018-10-25 13:11 42K 
[   ]RE_ For review_ TN March 6.pdf2018-10-25 13:11 61K 
[   ]RE_ LDC Affordability Fund_1.pdf2018-10-25 13:11 23K 
[   ]RE_ LTEP Consultation.pdf2018-10-25 13:11 61K 
[   ]RE_ LTEP_2.pdf2018-10-25 13:11 31K 
[   ]RE_ Leg calendar.pdf2018-10-25 13:11 39K 
[   ]RE_ MMMP binder.pdf2018-10-25 13:11 20K 
[   ]RE_ Media Request_3.pdf2018-10-25 13:11 78K 
[   ]RE_ Note for review_ Energy Avail in Ottawa.pdf2018-10-25 13:11 50K 
[   ]RE_ Note for review_ Energy Avail in Ottawa_1.pdf2018-10-25 13:11 50K 
[   ]RE_ OESP - Help_.pdf2018-10-25 13:11 30K 
[   ]RE_ OP Trust.pdf2018-10-25 13:11 32K 
[   ]RE_ Planning Documents.pdf2018-10-25 13:11 30K 
[   ]RE_ Potential Addition to Energy Price Mitigation Submission.pdf2018-10-25 13:11 33K 
[   ]RE_ Price Mitigation Proposals_Dec5-16_v11.pptx.pdf2018-10-25 13:11 16K 
[   ]RE_ Proposed Materials _ Winter_Spring Leg Discussion.pdf2018-10-25 13:11 48K 
[   ]RE_ REMINDER - June 27th Cabinet Meeting Agenda - notes are due by 2_00 Wednesday June 21st.pdf2018-10-25 13:11 29K 
[   ]RE_ Rate Mitigation Plan Options_Feb 9 version _2000_Clean.pptx_1.pdf2018-10-25 13:11 16K 
[   ]RE_ Rate Mitigation for P's binder.pdf2018-10-25 13:11 36K 
[   ]RE_ Rate Mitigation for P's binder_1.pdf2018-10-25 13:11 16K 
[   ]RE_ Stakeholders _ Ontario's Fair Hydro Plan.pdf2018-10-25 13:11 49K 
[   ]RE_ Stakeholders _ Ontario's Fair Hydro Plan_1.pdf2018-10-25 13:11 45K 
[   ]RE_ Stakeholders _ Ontario's Fair Hydro Plan_2.pdf2018-10-25 13:11 45K 
[   ]RE_ You back_ We're going to stroll around to chat if you are.pdf2018-10-25 13:11 40K 
[   ]RE_ energy materials.pdf2018-10-25 13:11 62K 
[   ]RE_ leg planning.pdf2018-10-25 13:11 49K 
[   ]RPP Pilot Update for Minister_for_distribution.pptx_1.pdf2018-10-25 13:11 487K 
[   ]Rate Mitigation Measures_December 9 2016 v2_2.pdf2018-10-25 13:11 727K 
[   ]Rate Mitigation Measures_December 9 2016 v3_6.pdf2018-10-25 13:11 707K 
[   ]Rate Mitigation Plan Options_Clean_SH_6pm.pptx_9.pdf2018-10-25 13:11 1.5M 
[   ]Rate Mitigation Plan Options_Feb 9 version _1230.pptx_12.pdf2018-10-25 13:11 1.4M 
[   ]Rate Mitigation Plan Options_Feb 9 version _2000_Clean.pptx_7.pdf2018-10-25 13:11 1.2M 
[   ]Rate Mitigation Plan Options_Feb 9 version _2000_Clean.pptx_8.pdf2018-10-25 13:11 1.2M 
[   ]Rate Mitigation for P's binder.pdf2018-10-25 13:11 24K 
[   ]Re_ Both Gillian and I expect you to return with treats.pdf2018-10-25 13:11 62K 
[   ]Re_ Communications Products _ Fair Hydro Act intro May 10_3.pdf2018-10-25 13:11 51K 
[   ]Re_ DRAFT Communications Products _ Fair Hydro Plan Act.pdf2018-10-25 13:11 53K 
[   ]Re_ DRAFT Communications Products _ Fair Hydro Plan Act May 8_1.pdf2018-10-25 13:11 73K 
[   ]Re_ Deck for _Price Curve_ discussion.pdf2018-10-25 13:11 15K 
[   ]Re_ Discussion with OPSEU re_ Corrections.pdf2018-10-25 13:11 30K 
[   ]Re_ ENE Cabinet Submission DRAFT _ Rate Mitigation - Decision Deck.pdf2018-10-25 13:11 57K 
[   ]Re_ Energy Rates for Hospitals_1.pdf2018-10-25 13:11 53K 
[   ]Re_ Energy reg - Reg2017.0643 - Amending O. Reg. 196_17 (Invoicing Requirements) - Sealing issue.pdf2018-10-25 13:11 79K 
[   ]Re_ LTEP_OFHP briefing_2.pdf2018-10-25 13:11 23K 
[   ]Re_ LTEP_OFHP briefing_3.pdf2018-10-25 13:11 23K 
[   ]Re_ OESP_2.pdf2018-10-25 13:11 23K 
[   ]Re_ Rate Mitigation - Final Cab Sub.pdf2018-10-25 13:11 43K 
[   ]Re_ new minute_5.pdf2018-10-25 13:11 60K 
[   ]Renaming _Clean Energy Adjustment_.pdf2018-10-25 13:11 15K 
[   ]Res_TOU_10_1.pdf2018-10-25 13:11 860K 
[   ]Revised ENERGY Slide for 11am.pdf2018-10-25 13:11 14K 
[   ]Scalable Initiatives_Feb 17 2017-6pm-Buys-NotBuys.pptx_4.pdf2018-10-25 13:11 198K 
[   ]Small Business rate relief a sham.docx_3.pdf2018-10-25 13:11 245K 
[   ]TAB 5 - Cabinet Submission - Electricity Price Mitigation_Accounting Dia....pptx_2.pdf2018-10-25 13:11 53K 
[   ]TB note_3.pdf2018-10-25 13:11 20K 
[   ]Thurs -Hydro Calls.docx.pdf2018-10-25 13:11 280K 
[   ]Tuesday Meeting Materials _ LTEP Briefings (decks).pdf2018-10-25 13:11 12K 
[   ]_Details - Fall & Spring Bills (Jan xx 2017)_draft.docx.pdf2018-10-25 13:11 596K 
[   ]_Summary - Fall & Spring Bills_(Nov 15 2016)_draft.pdf2018-10-25 13:11 181K 
[   ]_Summary - Fall Bills_(Jun 8 2017)_1.pdf2018-10-25 13:11 568K 
[   ]_Summary - Fall Bills_(Jun 8 2017)_2.pdf2018-10-25 13:11 568K 
[   ]don't forget about the clean energy adjustment!.pdf2018-10-25 13:11 25K 
[   ]lectricity Pricing deck - 20161014.pptx_2.pdf2018-10-25 13:11 429K 
[   ]materials.pdf2018-10-25 13:11 21K 
[   ]multi-service procurement for storage.pdf2018-10-25 13:11 27K 
[   ]planning docs.pdf2018-10-25 13:11 19K 
[   ]price mitigation minute draft Feb 24 330pm.docx.pdf2018-10-25 13:11 55K 
[   ]scalable options.pdf2018-10-25 13:11 21K 
[   ]story board.pdf2018-10-25 13:11 17K 
[   ]thunder bay paper.pdf2018-10-25 13:11 42K